Project:
Large Cottage-Style Wooden Playhouse Plans with Porch (Ages 2-10)
Package:
4 PDF Files Total
PDF Technical Drawings and PDF Material List in Separate Imperial and Metric Files
Out of many great designs, I liked this one the best, nice work
Feb 7, 2026 · Richárd
I love it! And so does my son and his friends!
Nov 9, 2025 · Kaylee
Easy to follow, great product
Oct 13, 2025 · David
Great design provided and swift customer service.
Sep 27, 2025 · franklinian99
Exactly as it says - instant download. Easy to understand.
Sep 13, 2025 · Nicole
Out of many great designs, I liked this one the best, nice work
Feb 7, 2026 · Richárd
I love it! And so does my son and his friends!
Nov 9, 2025 · Kaylee
Easy to follow, great product
Oct 13, 2025 · David
Great design provided and swift customer service.
Sep 27, 2025 · franklinian99
Exactly as it says - instant download. Easy to understand.
Sep 13, 2025 · Nicole
I designed this project for people who want a large, simple playhouse in the yard, one children can step into and claim as their own little house. The back and both side walls are closed and the front is open; on top is a 33° gable roof (a roof whose two sloping surfaces meet at the top along a line called the ridge). I designed the project with children ages 2-10 in mind.
A covered porch: The deck (the wooden floor the structure stands on) extends 23-1/4" (59.1 cm) in front of the walls, and this part stays under the roof. Two 2×4 posts carry the front end of the roof; they define the 32" (81.3 cm) opening between them and the step at the entrance. The front has no wall; the sections between the posts and the side walls are open too. This gives a small threshold area in front of the entrance that is sheltered from rain, and the interior gets daylight through the open front.
A two-layer wall: The lower part of the walls is a skirt of horizontal 1×4 boards, the upper part is 3/4" (19 mm) plywood. This split gives the structure its cottage look; I recommend painting the two surfaces (the lower skirt and the upper plywood) in different colors. The back wall has a horizontal window opening, and each of the two side walls has a vertical one.
Large scale: The walls are 88" (223.5 cm) high above the deck; an adult can stand inside without stooping. As children grow, the structure doesn't become too small; and when painting, decorating and doing maintenance, you can work comfortably inside too.
When complete, the structure has a deck of 120" × 144" (304.8 × 365.8 cm), a roof of 155-1/8" × 158" (394.0 × 401.3 cm), and a total height of 109-1/16" (277.0 cm). Height is measured from the ground to the ridge, that is, the highest line of the roof.
- Deck area: 120 sq ft (11.1 m²), including the porch
- Deck height (from the ground): 5" (12.7 cm)
- Wall height (above the deck): 88" (223.5 cm)
- Interior width (between the inside faces of the walls): 106-1/2" (270.5 cm)
- Porch depth (in front of the walls): 23-1/4" (59.1 cm)
- Entrance (clear opening between the two front posts): 32" (81.3 cm)
- Lower end of the side eaves (from the ground; the eaves are the edges of the roof that project beyond the walls): 55-1/4" (140.3 cm)
- Roof slope: 33°
When reserving space, look at the roof dimensions, not the deck dimensions. The eaves project beyond the deck on every side; at the sides this overhang is about 17-1/2" (44.5 cm). Plan the distance to fences, walls or tree branches using 155-1/8" × 158" (394.0 × 401.3 cm).
For ground preparation, I specify a level area of 126" × 146" (320.0 × 370.8 cm) on the plan sheet; this area is a little wider than the deck in every direction. Details are in the Ground Preparation and Base Frame section.
4 PDF files:
- Imperial plan sheet (A3): dimensions in inches
- Metric plan sheet (A3): the same drawings, dimensions in centimeters
- Imperial and metric material lists: in A4 size
The plan sheet is a cover plus 20 pages. P01 is the welcome and terms of use. P02–P15 are technical drawings: ground preparation and base frame plans, the floor plan and roof plan, four elevations and four sections. P16–P20 are written build steps with a drawing for each step: build and assembly order, base frame and deck, wall frames and entrance structure, roof frame, cladding and final details.
You can print the sheets on A4 or A3; I recommend A3, because the sheet is laid out for that size and the dimension text in the elevation and section drawings is easier to read on larger paper. If you'll view them on screen, turn your phone sideways.
No CNC files, none needed: This project is a classic wooden structure built from lumber and plywood; every part is a straight cut. You can take the cut lengths from the plan sheet and cut them with common shop tools such as a circular saw, a miter saw and a jigsaw. The places that demand more care are the 33° angled end cuts on the members that carry the roof and the notches cut in place; for details, see the Front Entrance and Porch and Roof Frame and Angled Cuts sections.
The material list deliberately has no screw or nail lengths. The right length depends on the joining method you choose and the lumber section you find in your region; you can find my recommendations by product type in the Fasteners and L Brackets section.
This structure will stay outdoors year-round, very close to the ground; children will constantly touch its deck, step and window edges. So I look at two things when choosing materials: resistance to moisture and insects, and how clean and splinter-free the surface can stay.
Lumber: I recommend pressure-treated. Look for pressure-treated lumber: the preservative is forced into the wood under pressure, so it resists moisture and insects. Today, lumber for residential use is treated with arsenic-free preservatives such as ACQ, CA (copper azole) or MCA; look for one of these on the tag. Because the deck is only 5" (12.7 cm) above the ground, the base frame is the part most exposed to ground moisture; for these parts, choose the grade whose tag says "ground contact".
- Works, but: naturally durable species such as cedar (western red cedar) last a long time outdoors even untreated; however, it costs more and, being softer, scratches easily.
- Avoid: old CCA lumber. CCA (chromated copper arsenate) is an older arsenic-containing preservative; its residential use was discontinued in 2003. Reclaimed or salvaged fence and deck lumber can be of this type; don't use it in a children's play structure.
Parts that don't touch the ground may also need "ground contact" lumber. In the U.S., the American Wood Protection Association (AWPA), which defines the preservative-treatment categories, recommends this category (UC4A on the tag) not only for parts that touch the ground but also for parts that carry the structure, are hard to replace later, or sit very close to the ground. Parts that sit less than 6" (15.2 cm) above the final grade, meaning the ground level after fill and grading are finished, and rest on wood or concrete without a moisture barrier underneath also fall into this group. In this project, the top of the deck is 5" (12.7 cm) above the ground, so the base frame's 2×4s, the 1×4 joists and the deck boards resting on them all fall below this limit; I recommend choosing all of them from this category. UC4A is a code from the U.S. system; if you are buying lumber in another country, tell the seller how close to the ground the part will sit and whether it carries the structure.
Inspect each piece as you choose: lumber should be straight and free of cracks. Warped or cracked pieces weaken the structure; this applies especially to the 2×4s of the base frame and to the front posts.
Plywood: exterior grade. The upper part of the walls, the window frames and the roof panels are made from 3/4" (19 mm) plywood. Look for exterior-grade plywood, whose layers are bonded with water-resistant glue. A more durable option is marine plywood: it has no voids in the inner layers, but it is noticeably more expensive. Because most of the wall panels will stay visible, choose sheets with a smooth, clean face.
- Avoid: interior-grade plywood, OSB and particleboard. As they take on moisture outdoors, their layers separate or their edges swell; the wall surface breaks down and the roof lets in water.
Material list:
- 1×4 lumber: 8 ft (2.44 m) × 5 · 10 ft (3.05 m) × 44 · 12 ft (3.66 m) × 5 · 16 ft (4.88 m) × 6 — total 636 ft (193.9 m)
- 2×4 lumber: 8 ft (2.44 m) × 6 · 10 ft (3.05 m) × 2 · 12 ft (3.66 m) × 5 · 16 ft (4.88 m) × 2 — total 160 ft (48.8 m)
- 1×4 deck boards: 10 ft (3.05 m) × 35 — total 350 ft (106.7 m)
- 3/4" (19 mm) plywood: 4×8 ft (122 × 244 cm) × 20 sheets — 640 sq ft (59.5 m²)
- L brackets: up to 2×3" (5.1 × 7.6 cm), 40 pieces
- Shingles (roof covering): recommended; details in the Roofing: Shingles section
The list gives quantities as lengths and piece counts; it already includes an allowance for cutting waste and small mistakes. Plan your cuts ahead from the dimensions on the plan sheet: assign the long lengths to the longest parts and use the short offcuts on short parts. If your lumberyard doesn't have the same lengths, you can calculate by dividing the total length by your own lengths; but check on the plan sheet that the longest parts can be cut from a single piece of your length.
The metric list rounds the lengths. In the metric list the lengths are written as 240, 300, 360 and 480 cm; these are slightly shorter than the imperial lengths (2.44 / 3.05 / 3.66 / 4.88 m). If you shop in metric lengths, before cutting the longest parts compare the length of the lumber you have with the dimension on the plan sheet.
Check the number of deck boards against your own boards. The deck boards are 10 ft (3.05 m) long; this equals the deck width (120" / 304.8 cm), so each row is spanned by a single board. How many rows are needed depends on the actual width of the board and the gap you leave between boards: divide the deck depth, 144" (365.8 cm), by the sum of the board's actual width and the gap, and compare the result with the count on the list.
Nominal and actual size: Lumber sold as "2×4" at the lumberyard isn't actually that size: because it's dried and planed, it measures 1-1/2" × 3-1/2" (38 × 89 mm). Likewise, "1×4" is actually 3/4" × 3-1/2" (19 × 89 mm). The names in the list are these nominal sizes; the metric list converts them to millimeters (25 × 102 mm for the 1×4, 51 × 102 mm for the 2×4), and these are also nominal values. The plan sheet's drawings also use nominal sizes. If lumber is sold in different sections in your region, check the notch and joint dimensions against the actual size of your lumber before cutting.
Why I don't give lengths: The material list deliberately has no screw or nail lengths. Not everyone joins this structure the same way, and the lumber section varies by region. Writing a single length would tie you to one method or point you to the wrong product. You can determine the right length from the joints on the plan sheet and the actual thickness of the lumber you buy; if you get stuck, message me on Etsy.
Nails or screws: For the base frame, deck and wall frames, no metal connector is needed; nails or wood screws of a suitable length are enough. Fix the deck boards to the joists with outdoor-rated screws.
L brackets: The list has 40 L brackets, up to 2×3" (5.1 × 7.6 cm). They are used in the roof frame, at the connection points I marked in the plan sheet's drawings. For these load-bearing connections choose a structural angle bracket, a metal corner connector rated for structural use; thin decorative corner braces don't do this job.
By product type, my recommendations are:
- Recommended: outdoor-rated hot-dip galvanized or stainless steel screws and nails. Choose ones whose tag says they can be used with treated lumber; modern preservatives contain copper and quickly corrode unprotected steel. The same rule applies to L brackets.
- Avoid: interior-use screws, that is, black drywall screws and bright zinc-plated screws. Outdoors and in treated lumber they rust quickly; rusty screws stain the wood and lose their grip.
Don't leave screw or nail tips protruding where a child's hand or clothing could touch them. Countersink the screw heads; especially on the deck and the step.
The roof panels are 3/4" (19 mm) plywood. Shingles over the panels are recommended, not required. Shingles are bituminous covering pieces nailed to the roof in overlapping rows from the bottom up; look for asphalt shingles. They protect the interior from water; I especially recommend them if you'll put things inside the playhouse or decorate it.
- Underlayment and installation: follow the manufacturer's instructions for the product you buy on the waterproof underlayment to go under the shingles, the overlap and the nailing.
- Slope: The roof has a 33° slope, which is within the common application range for asphalt shingles. Still, check the minimum slope value on the product label.
If you won't use shingles, coat the top face of the plywood roof completely with an exterior protector. The top of the roof is the surface that gets the most rain and sun; leave no part unprotected, plywood edges included.
Two-stage finishing: The plan sheet applies the same rule at every step: the first coat of paint or protector before assembly, while the parts are separate; the final coat after the structure is complete, after a light sanding if needed. So every visible surface gets at least two coats. While the parts are separate, you can reach the sides and undersides of the deck boards and the inner edges of the window frames much more easily.
Don't skip cut ends and edges on the first coat. The end grain at the cut ends of the base frame, front posts and deck boards, and the edges of the plywood wall and roof panels, soak up water far more readily than the face of the board. While the parts are separate, brush a coat of primer onto these ends and edges on the parts you will paint, and a coat of the same product on the parts you will finish with a protector or varnish. According to the USDA Forest Products Laboratory's Wood Handbook, water that gets in through an unsealed end stays trapped inside, especially in a painted part, and rot can begin; because the deck is only 5" (12.7 cm) above the ground, this matters most for the base frame and the deck boards.
Where to take how much care:
- Base frame: protector before assembly; especially the surfaces that will be exposed to ground moisture.
- Deck boards: sand the visible faces and edges; apply the first coat to all accessible faces, especially the side and underside faces you won't be able to reach after assembly.
- Wall frames: no sanding or painting needed, since they stay inside the cladding and won't be visible.
- Front posts, top frame and roof frame: the visible faces; the faces that will touch the roof or other members can be left unfinished.
- Wall cladding, window frames and roof panels: most of these will stay visible, so the most careful preparation goes here.
Product type: For painted surfaces use exterior wood paint; for surfaces you want to look natural, use exterior varnish, also called marine varnish or spar urethane. Calculate how much to buy from the coverage area on the product label.
- Avoid: interior wall paint (latex or other water-based wall paint). Outdoors it blisters and flakes quickly; on surfaces hands touch, it peels off in flakes.
Two tones: The lower skirt and the upper plywood are two separate surfaces with a clear line between them. I recommend painting them in different colors; two tones bring out the structure's cottage character. Because the first coats go on before assembly, you also set up the color split while the parts are separate.
Pressure-treated lumber may be sold wet; let it dry before painting. Ask your lumberyard how long to wait, and check the label of the paint product. Let the final coat dry completely before opening the structure to children; the time is written on the product label.
No concrete foundation needed. I designed this structure as a lightweight system; it can be built on level, compacted soil. The ground needs to be solid, well leveled and well draining. If you're unsure about the ground, lay a compacted layer of gravel under it.
Sheet P02 of the plan sheet gives the area to prepare as 126" × 146" (320.0 × 370.8 cm); this is a little wider than the deck in every direction. Don't choose a corner where water collects or turns to mud after rain: because the deck is only 5" (12.7 cm) above the ground, water collecting underneath directly affects the base frame.
Base frame: You build a frame of 2×4 lumber measuring 118" × 143" (299.7 × 363.2 cm); 1×4 joists (the horizontal members that carry the floor) go between its members at equal spacing. Nails or wood screws of a suitable length are enough for the connections.
Before moving on to the deck, check that the frame is square and level. Measure the two diagonals: if they're equal, the frame is square. The walls and roof are built on this frame; any out-of-squareness left here grows at the wall corners and roof joints and shows up there.
Apply a light sanding and a coat of protector to the frame parts before assembly; especially to the faces that face the ground.
You lay the deck boards (1×4; 1×3 if you prefer) over the base frame, perpendicular to the joists. Fix each board to every joist beneath it with nails or outdoor-rated screws.
Leave gaps between the boards. Wood swells when it takes on moisture and shrinks as it dries; the small gap between boards absorbs this movement, lets rainwater drain and ventilates the underside of the deck. Keep the gap equal in every row; using the same spacer in every row (e.g., a nail or a thin strip of wood) keeps both the look and the board-count calculation consistent.
Don't fit the front-most deck board yet. The front posts are attached to the base frame in the next stage; once the posts are in place, you fit the front-most board by cutting notches around the posts in place. Details are in the Front Entrance and Porch section.
Finishing: Before assembly, lightly sand the visible faces and edges of the boards and take off the sharp corners; apply the first coat to all accessible faces, especially the side and underside faces you won't be able to reach after assembly. Once the structure is complete, lightly sand the surface again if needed and apply the final coat. The deck is the surface children sit on most and walk on barefoot; the edges matter especially here.
The wall frames are 1×4 lumber. You prepare the back wall and the two side walls as separate units, with their window openings. There is no wall at the front.
Installation order:
- Back wall — put the back wall in place and fix it to the deck; make sure it sits exactly square.
- Side walls — fix both side walls to the deck and to the back wall; keep the corners square.
- Check — before moving on to the next stage, check that all the members are aligned and securely connected.
At this stage no metal connector is needed; standard nails or wood screws are enough for all connections. The walls are 88" (223.5 cm) high above the deck; the back wall has a horizontal window opening and the side walls have a vertical one.
Build the back wall square; the side walls are aligned to it. A small angle error in the back wall grows at the front ends of the side walls and shows up at the joint between the front posts and the roof.
Since the wall frames stay inside the cladding and won't be visible, no sanding or painting is needed at this stage.
There is no wall at the front; a top frame of 2×4 lumber carries the front of the roof. The posts and the horizontal members that tie them together both carry the roof and define the entrance opening. There is a 32" (81.3 cm) clear opening between the two front posts; the deck extends 23-1/4" (59.1 cm) in front of the walls to form the porch that stays under the roof. A step of 1×4 lumber goes in front of the entrance.
Read before cutting: the ends of the two horizontal members that will carry the roof are cut at a 33° angle. Make this cut before you join the members and stand them in place; the details of the angle are in section B-B on P13. Cutting the end of a member at the correct angle once it is already standing in place is much harder, and this angle determines how the roof frame seats.
Front posts: You attach the two front posts that define the entrance directly to the base frame at their lower ends. Before fixing the upper members, check with a level from two directions that the posts are exactly plumb (vertical); a leaning post carries the roof leaning too. Once the posts are in place, fit the front-most deck board by cutting notches around the posts in place.
There is no railing on the porch; the deck is 5" (12.7 cm) above the ground and the front is completely open.
Finishing: Sand the visible faces of the posts and top frame before assembly and apply the first coat; the faces that will touch the roof directly can be left unfinished.
In the cladding stage the walls are closed in two sections:
- Lower skirt: 1×4 lumber, in horizontal rows.
- Upper section: 3/4" (19 mm) plywood panels.
Make sure the panels are aligned and securely connected, and that they finish in the same plane at edges and corners.
The side wall panels don't come from a single sheet. In this project some plywood pieces are larger than a standard 4×8 ft (122 × 244 cm) sheet; these are on the side walls. Make the side wall panels by joining more than one piece of plywood. If you align the seams with the lines where the window openings start or end, the joint looks like part of the design and assembly gets simpler. Plan these seams from the start when you cut the sheets.
Windows: The clear dimensions of the window openings are 30-1/2" × 14-1/2" (77.5 × 36.8 cm, horizontal) on the back wall and 14-1/2" × 30-1/2" (36.8 × 77.5 cm, vertical) on the two side walls. The edges of the openings are finished with a 3/4" (19 mm) plywood frame; the windows have no glass. Sand the frame edges carefully, because children's hands will often touch them.
Finishing: Because most of these surfaces will stay visible, surface preparation is the most important step here. Lightly sand the visible faces and edges and soften exposed corners; apply the first coat before assembly wherever you can reach, and the final coat after assembly.
The roof is a gable roof with a 33° slope; its frame is 1×4 and 2×4 lumber. The rafters (the members that run along the roof slope and carry the sheathing) are 92-1/2" (235.0 cm) long overall and are spaced with 29" (73.7 cm) gaps between them.
Prepare the roof on the ground: You can assemble the frame on the ground in two separate sections, left and right, then lift them and place them on the supporting structure you built in the previous stage. Once in place, connect the two sections to each other at the middle support. The highest point of the structure is 109-1/16" (277.0 cm) above the ground; instead of joining the members up there one by one, you do most of the work on the ground, at a comfortable work surface. Work with at least two people when lifting each section.
The angled cuts are the most critical point of the assembly. The details of the cut angles are in section B-B on P13. Some members also need notches; cut these notches in place: take the measurement directly from the built wall structure, or make a simple template. Cut the first piece and test it in place; if it fits, use it as a template and cut the others to match.
L brackets: Some connection points need a metal L bracket; these points are marked in the plan sheet's drawings. For choosing them, see the Fasteners and L Brackets section.
Once the frame is complete, you place the 3/4" (19 mm) plywood roof panels on it; shingles go on top if you wish. The roof frame doesn't need rounded edges; apply the first coat to the accessible faces before assembly, and the faces that will touch other members can be left unfinished.
On this project, sanding is not a finishing detail but a safety step. Children will sit on the deck, walk around barefoot and hold on to the window edges; the plan sheet also recommends sanding all visible surfaces and edges and softening exposed corners.
Order of priority:
- Deck and step: the surface with the most contact; visible faces, edges and sharp corners.
- Window frames and plywood edges: because the plywood edge is layered, it's where splinters come most easily.
- Front posts and the entrance: a child's hand touches here most often.
- Eaves corners: the lower end of the side eaves is 55-1/4" (140.3 cm) above the ground, that is, at a child's height; soften these corners especially.
Sanding sequence: Start with 80 grit on rough surfaces, continue with 120, and finish the surfaces hands touch with 180 grit. Lightly round off sharp corners and edges with sandpaper. After the first coat, feel the surface with your hand: paint or varnish can raise the wood grain; if you feel roughness, go over it lightly with fine sandpaper and apply the final coat.
Sand before assembly, while the parts are separate. The wall frames and the roof frame don't need this care; put your effort into the visible surfaces and the ones hands touch. When assembly is done, run your hand over the whole structure once; no screw head should be left protruding and no edge raised.
I designed the project with children ages 2-10 in mind. This is a design target, not a declaration of compliance with a play equipment standard. I recommend adult supervision during use, especially for younger children.
The deck is 5" (12.7 cm) above the ground. I designed the front open: the structure has no door or railing, and children can go in and out along the whole front. So:
- Recommended: soft surfacing in front of the step and the front edge of the deck, in the area where children jump down and run: grass, wood mulch or bark, or rubber surfacing made for playgrounds.
- Avoid: leaving the area in front of the entrance as concrete, stone or asphalt.
Safety-relevant notes:
- Ground: the structure should be built on solid, level, well-draining, prepared ground.
- Eaves corners: the lower end of the side eaves is 55-1/4" (140.3 cm) above the ground and projects beyond the walls; it can come to the head height of a child running around the structure. Soften the corners and plan the play area accordingly.
- Edges and surfaces: the deck, step, window frames and all exposed corners should be sanded and softened.
- Connections: no screw or nail tips should protrude.
Rules on play structures vary by country and municipality; local rules take precedence over this plan. Check the rules in your area before building.
A wooden structure outdoors moves a little with every season: wood swells when it takes on moisture and shrinks as it dries, and connections loosen over time. I recommend doing these checks at the start of every season, and more often if use is heavy:
- Connections: re-secure loosening screws and nails, especially at the points where the front posts connect to the base frame and at the L brackets on the roof. The U.S. Consumer Product Safety Commission (CPSC) home playground safety handbook recommends checking and tightening nuts and bolts twice a month; because the connections in this project are made of screws, nails and L brackets, I recommend applying the same frequency to them.
- Deck: replace boards that lift, crack or soften; clear the leaves and soil that collect between boards so water can drain.
- Splinters and edges: feel the step, window frames and plywood edges with your hand; sand rough spots and repaint.
- Roof: if you used shingles, replace any that lift or are missing; if you didn't, check the protective coat on the top of the plywood.
- Paint and protection: renew places that blister or wear, especially on the top of the roof, on the lower skirt and on parts near the ground. If you finished the surfaces you left natural with clear varnish: varnish in direct sun hardens, cracks and peels over time; according to the Wood Handbook it generally needs renewing every 1–2 years, and the interval varies with climate and sun. If you see blistering or peeling, don't wait; varnish that is lifting brings back the splinter risk.
- Ground and drainage: make sure no water collects under and around the structure; if the soft surfacing in front of the entrance has scattered, top it up.
Resizing the plan sheets on your printer doesn't change the size of the structure; the drawings are dimensioned technical drawings, with the measurements written on them. This is a load-bearing structure: the lumber sections, joints, roof slope and material list are prepared for the dimensions I give. Changing a dimension also changes the lumber lengths, joints, roof cuts and material list. If you want a different size, message me on Etsy before adapting the project yourself — we can work out together which measurements can change.
Yes — this is a standard, platform-wide Etsy feature. The download link doesn't expire; you can re-access your files anytime from the "Purchases and Reviews" page in your Etsy account, with no limit on how many times you download.
Of course — I make every plan myself, and you're welcome to reach out to me directly through Etsy with any question, before or after your purchase. I stand behind every design I share.
No — these files are for personal use only. Selling what you make from them, or using the design or files for any other commercial purpose, isn't included in this purchase.
I don't offer refunds once the files have been downloaded — this is standard practice given the nature of digital goods. That said, if you run into an actual problem with the files (won't open, something's missing), reach out and I'll help sort it out.
No. I designed this structure as a lightweight system; it can be built on level, compacted soil. The ground should be solid, level and well draining; if you're unsure about the ground, lay a compacted layer of gravel under it. Details are in the Ground Preparation and Base Frame section.
Not required, but I recommend it. Shingles protect the plywood roof panels and the inside of the playhouse from water; especially if you'll put things inside or decorate it. For the underlayment and installation, follow the manufacturer's instructions for the product you buy. If you don't use shingles, coat the top face of the plywood roof completely with an exterior protector.
The colors are up to you; I recommend painting the lower skirt and the upper plywood in different colors. Changing the cladding is a different matter: I drew the project with 1×4 boards on the lower section and 3/4" (19 mm) plywood on the upper section; all drawings and the material list are prepared accordingly. If you choose another exterior cladding, you may need to add framing members to the wall frames, and therefore buy additional lumber.
This varies by country and municipality, and I can't rule on it. Check with your local authority before building — as I note on the plan sheet, local rules take precedence over the plan.
Please select a heading above to see the project details.












